Corbett Community Forum
November 20, 2026, 01:10:30 PM *
Welcome, Guest. Please login or register.

Login with username, password and session length
News:
 
   Home   Help Search Calendar Login Register  
Pages: 1 ... 5 6 [7] 8 9 10
 61 
 on: October 09, 2021, 05:41:20 AM 
Started by www.corbettoregon.com - Last post by www.corbettoregon.com
All details here:
https://www.corbettwater.com/october-12th-board-meeting/

 62 
 on: October 04, 2021, 05:27:41 PM 
Started by www.corbettoregon.com - Last post by www.corbettoregon.com
Posted on Facebook by the Springdale Pub:

"Pumpkins for a cause! Minimum donation of $5 for any pumpkin in the bin. All money raised will be donated to the Corbett Cardinals Football program! Happy fall 🎃🍁"

 63 
 on: September 24, 2021, 10:41:55 AM 
Started by www.corbettoregon.com - Last post by www.corbettoregon.com
Corbett Hill Road Paving Update for Oct. 8, 2021
Recently Completed Work:
Stormwater Drains: Frames for stormwater catch basins were raised to match the higher profile of the re-paved road.
Shoulders: Aggregate rock was placed on shoulders along the road.
Striping: Lane striping was completed.
Guardrails: The height of guardrails was adjusted to match the higher profile of the repaved road. Damaged guardrails were repaired and new “soft-stop” end caps were installed at the end of several guardrails. These end caps improve driver safety by absorbing a crash impact while also stopping a vehicle before it leaves the road.
Remaining Work
Any work after Oct. 8 will be clean-up tasks or minor adjustments. No remaining work will impact traffic significantly.
Our thanks to all residents and road users for their patience during this short project. We hope you enjoy the smoother road surface.

>>>>

Corbett Hill Road Paving Update for Sept. 28, 2021

Project Status

Paving: was completed on Saturday, Sept. 25 before rains arrived.

Stormwater Drains: Frames for stormwater catch basins will be raised on Thursday, Sept. 30 to match the higher profile of the re-paved road

Shoulders: On Thursday, Sept. 30, aggregate rock will be placed on shoulders along the road. This work will require flaggers.

Striping: Depending on weather, lane striping will be applied on Wednesday, Sept. 29 or Friday, Oct. 1. Lane striping will require dry weather.  This will take about three to four hours and will require flaggers and a pilot car, similar to the traffic control used on paving days.



Guardrails: Next week the height of guardrails will be adjusted due to the higher profile of the repaved road. We expect the work on the guardrails to take most of the week.  Some damaged guardrail will be repaired. This work will also require flagging traffic at times for safety.

Project Completion: Weather permitting, all field work should be complete by Friday, Oct. 8.

Project Website: https://www.multco.us/roads/webform/corbett-hill-road-paving





Corbett Hill Road Paving Update (9/24/21)


"Paving Schedule:  Due to a forecast for rain on Monday, Sept. 27, our contractor plans to pave Corbett Hill Road today and Saturday, Sept. 25 from 7 am to as late as 7 pm.  The work on Saturday will allow the project to stay on schedule.  An additional paving day may be needed next week.
Other Work: Temporary centerline delineation will be installed after paving. After paving, we will be back to a standard flagging operation without the pilot car. Crews will be working on placing the gravel shoulders and replacing a concrete driveway near the bottom of the hill. Then crews will adjust and replace sections of guardrail and add the centerline and fog line striping starting late next week. The project should be complete by October 8.
For project information visit: https://www.multco.us/roads/webform/corbett-hill-road-paving
"


NEWS RELEASE
Corbett Hill Road paving project begins Sept. 21

A project that will repave Corbett Hill Road near the community of Corbett begins Tuesday, September 21 and is scheduled to be complete by October 1. After completing preparation tasks, paving is planned on September 23, 24 and 27, weather permitting.

The road will remain open to traffic, with flaggers and pilot cars directing traffic on a single lane at times. Drivers should expect delays of up to 15 minutes during peak daytime travel hours. There are no nearby alternate routes. Depending on the destination, the Historic Columbia River Highway also links Corbett to Interstate 84 to the east and west.

Corbett Hill Road is the main road connecting Interstate 84 with Corbett. The mile and a half-long road has a steep grade and numerous curves. The contractor, Brix Paving Northwest, will repave the road from just west of Rasmussen Road near the freeway to the Historic Columbia River Highway at the top of the hill. The contractor will:

• Remove the current lane striping

• Add a two inch asphalt overlay on top of existing pavement

• Tie in paving to adjoining driveways and crossroads

• Adjust guardrail heights and repair or replace damaged guardrails

• Add gravel to shoulders

• Apply new lane striping



The contractor will work weekdays from 7 am until about 5:30 pm. Some work is weather dependent. Weekend work may be needed.

Multnomah County maintains Corbett Hill Road and 269 miles of roads in east county cities and unincorporated areas. For project information or to sign up for project updates, visit www.multco.us/roads/webform/corbett-hill-road-paving or follow us on Twitter @MultCoRoads.

* Thanks to Glennda Fields of Corbett (and of Glennda Field Fine Arts ) for her permission to use one of her beautiful images of a painting in Autumn of Corbett Hill Road. See more at her web site here: http://glenndafield.blogspot.com

 64 
 on: August 02, 2021, 08:56:58 AM 
Started by www.corbettoregon.com - Last post by www.corbettoregon.com

** UPDATE - ARIEL WAS FOUND AND IS HOME **


See the attached for more!
If anyone has any info, they can contact me, phone: 503-660-9978
email: christineheaton79@gmail.com

 65 
 on: July 29, 2021, 06:14:18 PM 
Started by Poindexter - Last post by Poindexter
Hi,

Does anyone know of anyone who has successfully restored their historic barn?  I am looking for a starting point (Restore Oregon has been zero help) such as good a architectural consultant, structural engineer, and tips for effectively working with the county.

Thanks!
John O
503-568-3281

 66 
 on: July 22, 2021, 08:04:33 AM 
Started by www.corbettoregon.com - Last post by www.corbettoregon.com

"AirPod case was found on the top of our mailbox on Mershon Road a while back. I apologize for taking so long to post this."

Reply here if these are yours!

 67 
 on: July 13, 2021, 11:36:55 AM 
Started by Poindexter - Last post by Poindexter
Sasquatch Shuttle runs visitors up and down Hwy 30 from the Women's Forum to Multnomah Falls.  They are looking for dependable help for the jobs listed but also for lot attendants and other positions.

Main Site:  https://sasquatchshuttle.com/

Employment Link: https://sasquatchshuttle.com/employment

Phone: (503) 852 9092

 68 
 on: July 03, 2021, 04:05:47 PM 
Started by www.corbettoregon.com - Last post by www.corbettoregon.com
**Missing Dogs**
Hi everyone, our friend Kaylee is missing her dogs Canyon and Wylder. They got away from her out on Larch Mountain in Oregon. If you are out there or are wanting to help please keep an eye out for these two dogs. Thank you for any and all help! Portland Club K-9 at 503-289-7472

 69 
 on: June 29, 2021, 01:17:45 PM 
Started by www.corbettoregon.com - Last post by www.corbettoregon.com
What do the American Flag and Corbett Fire Department have in common with the 4th of July?

Seven of our Founding Fathers, Benjamin Franklin, Thomas Jefferson, George Washington, Sammuel Adams, and John Jay, were volunteer firefighters. You may not be a Founding Father, but you can be a Corbett Volunteer Firefighter.

Applicants must live in the Corbett Fire Dist., be eighteen, have a valid driver’s license, fill out an application, and pass a physical agility test, as well as an oral interview. Men and women are urged to apply. Currently five of the twenty nine members are women. Note: Tessie Adams was selected as Oregon Volunteer Firefighter of the Year in 2017. Members range in age from the 20s to the 70s.

Prospective members are urged to attend an informational meeting at 7:00PM July 21, 2021, at the Corbett Station. Applications can be printed by going to corbettfire.com. Applications are due Aug 11, 2021. You can email us with questions from the web site.

Be part of a proud 72 year old tradition. Since 1998, seven Corbett Firefighters have been selected as Oregon Vol. Firefighter of the Year.

https://www.corbettoregon.com/american-flag-corbett-fire-department-common-4th-july/

 70 
 on: June 22, 2021, 11:06:08 AM 
Started by www.corbettoregon.com - Last post by www.corbettoregon.com
Bridal Veil Historic Preservation Society-Fundraiser

OUTDOOR SALE July 24th & 25th
proceeds and donations aid the society to keep up with the care and preservation of
our historic cemetery and the BVHPS property surrounding the cemetery.
Please come to enjoy the peace and beauty of the area. ABC ART-ANTIQUES, ARMOIRES -BOOKS
very old, history ,recent fiction, and book case-, Cookies- Cards, chairs(outdoor).


Contact Information:
Geri Canzler
canzlergeria@gmail.com
Bridal Veil Historical Preservation Society

Pages: 1 ... 5 6 [7] 8 9 10
Powered by MySQL Powered by PHP Powered by SMF 1.1.14 | SMF © 2006-2011, Simple Machines LLC Valid XHTML 1.0! Valid CSS!